EICR for landlords: how often, what is checked and what happens next
A landlord in England needs an EICR at least every 5 years, or sooner if the last report says so: an inspection and test by a qualified person. Five years is the longest gap the law allows; the report can set an earlier date.
Source — checked
This page covers the law in England. Each claim in the sections below links to its own source and the date it was checked.
If anything is smoking or alight: get everyone out and call 999 first.
The Hero Agreement requires an electrician to hold competent person scheme registration, such as NICEIC or NAPIT.
How often an EICR is needed
In England, a landlord who grants or intends to grant a specified tenancy must ensure that the electrical safety standards are met while the premises are occupied under it, that every electrical installation in the premises is inspected and tested by a qualified person at regular intervals, and that every electrical installation is inspected and tested by a qualified person before the specified tenancy commences. 'At regular intervals' means at intervals of no more than 5 years, or, where the most recent report requires inspection and testing by an earlier date, no later than that date.
Source — checked
Which tenancies it covers
The Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020 apply in England only, to 'specified tenancies': a tenancy of residential premises in England that gives one or more people the right to occupy all or part of the premises as their only or main residence, provides for rent (whether or not a market rent), and is not of a kind excluded by Schedule 1.
Source — checked
What is inspected, and the C1, C2, C3 and FI codes
Electrical Installation Condition Report (EICR)
An EICR (also called an electrical safety check, fixed wire test, or periodic inspection and testing) is 'a document produced by an electrical inspector following a comprehensive health check of your home's or property's electrical installation,' covering wiring, consumer units, fixed equipment, and protective devices — but not plug-in appliances, which are 'not considered part of the electrical installation.' Findings are classified C1 (danger present, immediate action required), C2 (potentially dangerous, urgent remedial work needed), C3 (improvement recommended, not dangerous) or FI (further investigation required); a C1 or C2 finding makes the report 'unsatisfactory.'
Source — checked
Remedial work within 28 days
Where the report shows the landlord is, or may be, in breach of the electrical safety standards and requires further investigative or remedial work, the landlord must ensure that work is carried out by a qualified person within 28 days, or within any shorter period the report specifies, starting with the date of the inspection and testing.
Source — checked
When that work is done, the landlord must obtain written confirmation from a qualified person that it has been carried out and that the electrical safety standards are met, or that further investigative or remedial work is required, and must supply the written confirmation, with the report that required the work, to each existing tenant and to the local housing authority within 28 days of the work's completion. If further investigative work shows that more work is needed, the landlord must repeat those steps for that work.
Source — checked
A landlord is not in breach of these inspection and remedial duties if they can show they took all reasonable steps to comply. Where a tenant prevents the landlord, or someone acting for them, from entering the premises, the landlord is not treated as failing to take all reasonable steps solely because they did not bring legal proceedings to secure entry.
Source — checked
Copies, and keeping the report
After each inspection and test, the landlord must obtain a report giving the results and the date by which the next inspection and test is required, and must supply a copy to each existing tenant within 28 days of the inspection and test, and to the local housing authority within 7 days of receiving a written request from it. The landlord must retain a copy until the later of the date the next inspection and test is required and the date it is carried out, unless a more recent report supersedes it, and must give a copy to whoever carries out the next inspection and test. A copy of the most recent report must go to any new tenant before they occupy the premises, and to any prospective tenant within 28 days of receiving a written request from them.
Source — checked
EICR or EIC?
How an EICR differs from an Electrical Installation Certificate (EIC) is explained on our electrical services page.
If you own and live in the home
There is no law forcing an owner-occupier to have their home's electrics tested. NICEIC states directly: 'If you own your own home, there aren't any laws requiring you to obtain an EICR for your property. However, it's generally recommended (for example, by electrical safety charity Electrical Safety First) that you obtain an EICR at least once every 10 years.'
Source — checked
Penalty
Where a local housing authority is satisfied, beyond reasonable doubt, that a landlord has breached a duty under regulation 3 (or regulation 3B, 3C or 3D), it may impose a financial penalty, or more than one penalty for a continuing failure. A financial penalty may be of such amount as the authority determines, but must not exceed £40,000.
Source — checked
The maximum financial penalty under regulation 11 rose from £30,000 to £40,000 on 1 November 2025, under the Electrical Safety Standards in the Private Rented Sector (England) (Amendment) (Extension to the Social Rented Sector) Regulations 2025 (SI 2025/1043). For a tenancy granted before 1 December 2025 under which the landlord is a registered provider of social housing, the change took effect on 1 May 2026.
Source — checked
Checking an electrician's registration
To check whether an electrician is registered, the Registered Competent Person Electrical register offers a 'Check an electrician' search: 'Search by company name to see whether an electrician you may be considering is listed as registered.' The register says: 'All electricians listed and permitted to display the mark are registered with an electrical Competent Person Scheme Operator, and have been authorised by Government to self-certify that their work is compliant with Building Regulations.' It 'went live on 30th June 2014'.
electricalcompetentperson.co.uk
Source — checked
Common questions
How long is an electrical safety certificate valid for?
Can a normal electrician do an EICR?
Checked against the sources cited above between and ; each claim shows the date it was checked. Rules and guidance change — always confirm anything material against the official source before acting on it.
Need the check done?
Describe it in two minutes — you approve the price before any work starts.
Social housing
When the EICR duties began to apply to social housing tenancies is answered on our electrical services page.
When did EICR duties start applying to social housing tenancies?